Builders Technical Services, L.L.C. will manage all of your RREM program requirements, including:

New Jersey RREM Program Management

Pathway B – Grant Management Only – For Homeowners

  • Prepare and submit:
    • Pathway B contractor validation and Mandatory Contractor Agreement
    • Pathway B initial draw requests (construction and design)
    • Pathway B incremental draw requests (construction and design)
    • Pathway B final draw requests (construction and design)
  • Prepare and submit RREM Pathway B closeout documents, including Request for Final Inspection; Request for Release of Restrictive Covenant; Final Bills Paid Affidavit; Additional Scope Submission Form

Pathway B – Full Project – For Homeowners and/or Contractors

  • Prepare and submit municipal zoning permit application (see Municipal Zoning Applications for details)
  • Prepare and submit municipal construction permit application (see UCC Permit Applications for details)
  • Prepare and submit RREM Pathway B draw requests (construction and design)
  • Permit updates – preparation and submittal
  • Inspection scheduling and tracking
  • Coordination with client and design professionals to ensure that foundation location surveys, as-built surveys, and final elevation surveys are ordered in a timely manner
  • Delivery and submission of foundation location surveys
  • Delivery and submission of final engineering
  • Preparation and delivery of Certificate of Occupancy application

Pathway C – Full Project – For Contractors

Includes:

  • Prepare and submit initial bid documents and construction pricing forms via the Project Managers’ information systems (iBid, iBuild, Worltrac, etc.)
  • Prepare and submit Advance Design Draw request
  • Coordinate with contractor’s design professionals to acquire PDF copies of all architectural and engineering work.
  • Prepare design work for Step 6/8 (homeowner authorizations)
  • Submit completed Step 6 documentation
  • Generate Gantt chart, Site Logistics Plan (if required) and Schedule of Values for NTP Check List
  • Prepare and submit municipal zoning permit application (see Municipal Zoning Applications for details)
  • Prepare and submit municipal construction permit application (see UCC Permit Applications for details)
  • Coordinate with office staff to complete NTP checklist
  • Upload all required documents into the Project Managers’ information systems (iBid, iBuild, Worltrac, etc.)
  • Prepare and submit incremental payment requests
  • Prepare and submit RREM inspection requests
  • Prepare and submit change orders
  • Permit updates – preparation and submittal
  • Inspection scheduling and tracking
  • Coordination with client and design professionals to ensure that foundation location surveys, as-built surveys, and final elevation surveys are ordered in a timely manner
  • Delivery and submission of foundation location surveys
  • Delivery and submission of final engineering
  • Preparation and delivery of Certificate of Occupancy application
  • Prepare and submit affidavits for final draw
  • Prepare and submit request for final design draw
  • Track and submit for retainage